How to read a piping isometric (ISO) drawing

A piping isometric (ISO) is a 2D drawing of one pipe run shown in 3D perspective, paired with a title block and a bill of materials. Unlike a P&ID, an ISO carries the exact cut lengths, fittings, welds, and supports needed to fabricate and erect the pipe.

Cory LaChance

Cory LaChance

Founder, TakeOffTrak ·

ISO vs P&ID

Piping ISO compared to a P&ID
DocumentWhat it showsUsed for
P&IDSchematic flow of process lines, equipment, valves, and instruments (not to scale)Process scope, line list checks, valve and instrument counts
Piping ISOSingle pipe line geometry, dimensions, weld locations, support tags, and BOM tableFabrication, erection, weld counts, and material takeoff (MTO)

A line list links the two: each line row carries a P&ID reference, and one line can be fabricated across one or more ISO sheets.

Six parts of every piping ISO

  1. 1

    Title block

    Located at the bottom right. Holds the drawing number, sheet number (such as 1 of 3), revision, line number, nominal pipe size, piping spec, design code, and paint, insulation, NDE, or hydrotest callouts.

  2. 2

    North arrow and coordinates

    Located near the top corner. Sets plant North so every pipe run direction (North/South, East/West, Up/Down) and tie-in coordinate (N, E, EL) ties back to the plant grid.

  3. 3

    Bill of Materials (BOM)

    Printed on the side or top of the sheet. Lists every pipe length, fitting, flange, valve, gasket, bolt set, and support on that drawing with Item No., Description, Size, Quantity, and sometimes Commodity Code. Split into Shop and Field sections when printed.

  4. 4

    Balloon callouts

    Numbered circles or pointers on the pipe graphic that tie each physical component back to its Item No. row in the BOM table.

  5. 5

    Weld indicators and FW / FFW callouts

    Filled dots, circles, or ticks drawn at each welded joint along the pipe. Field welds carry an FW text callout or a crosshair/tick field mark. Field fit welds carry an FFW callout where pipe ships long for site trimming.

  6. 6

    Support tags and continuation match lines

    Support tags (such as S-2 or G-4) mark shoes, guides, anchors, and hangers along the run. Dashed match lines with CONT ON DWG notes mark where the line hands off to the next ISO sheet.

Reading size notation on the BOM

  • Straight pipe, elbows, caps, and flanges print one nominal size (such as 6" or DN150).
  • Reducers, reducing tees, and olets print two sizes (such as 6" x 2"): run or header first, branch or reduced end second.
  • Stud bolt sets print stud diameter by stud length (such as 3/4" x 4-1/4"), not pipe NPS. The quantity is the stud count, and nuts and washers belong to that set.
  • Pipe quantities print as total length (feet and inches, meters, or millimeters). Fittings, flanges, valves, gaskets, and supports print as counts (EA or SET).

For metric and hybrid NPS-metric drawings, check the NPS to DN conversion chart. For the full step-by-step takeoff workflow, read how to take off a piping ISO.

How TakeOffTrak reads your ISOs

TakeOffTrak reads the title block, extracts every BOM row, locates the weld indicators on vector PDFs, highlights every extracted item right on the drawing, and exports the results to Excel. Open the interactive demo to click through a real marked ISO.

Common questions

What is the difference between drawing number and line number on an ISO?
The line number identifies the process pipe line across the project. The drawing number identifies one specific ISO sheet. A long line can have five ISO drawings, each with its own drawing number and sheet number.
What does CONT ON DWG mean on a piping isometric?
Continuation on drawing. It marks the match line where the pipe run terminates on the current sheet and continues onto the referenced ISO drawing.
What does REFER TO LDT mean in an ISO title block?
Refer to Line Designation Table (the line list). It means the title block does not state that value directly and you pull it from the project line list instead.

Keep reading